Gravel and crushed stone calculator

This calculator turns a rectangular area and a depth into a volume, then into tons using a density you can replace. Cost is optional and uses the price you type. It does not add delivery, tax, or fabric.

Calculator

Results update as you type. The switch is remembered in this browser.

The loose depth you want delivered, before compaction.

An ordering allowance for uneven ground. Use 0 for the measured box only.

Leave blank to use 1.4 short tons per cubic yard, about 1.66 tonnes per cubic metre.

Optional. Leave blank to skip. The number is in your currency and does not include delivery.

Result

Enter the measurements to see the order quantity.

How this calculator works

Gravel is ordered as a volume and often paid for as a weight. The volume is the same box as a slab: length times width times depth. Depth in inches is divided by 12 to become feet, and cubic feet are divided by 27 to become cubic yards. Depth in millimetres is divided by 1,000. Waste multiplies that volume. Ten percent, the number already in the field, multiplies by 1.10.

Weight is the order volume times density. Leave density blank and the calculator uses 1.4 short tons per cubic yard. In metric that same default is about 1.66 tonnes per cubic metre, and the formula line shows the figure it actually multiplied. Type a different density when the quarry, the ticket, or the bag gives you one. The result labels the default so a blank field is not a mystery number.

Cost, if you type one, is that weight times your rate. Imperial cost is per short ton. Metric cost is per tonne. Switching units converts the rate so the material total does not jump. Delivery is never part of the line.

One cubic yard of material does not cover a fixed area until you pick a depth. The coverage is 27 divided by the depth in feet:

Loose depth Coverage of 1 cubic yard Coverage of 1 cubic metre
2 inches (about 50 mm) 162 square feet 20 square metres at 50 mm
3 inches 108 square feet
4 inches 81 square feet

A path that is 10 feet wide and 40 feet long is 400 square feet. At 3 inches that is 400 divided by 108, or about 3.70 cubic yards, which is the exact volume in the first worked example below. The table is the quick check. The calculator is what you use once waste and a real density enter the order.

Worked examples

A 10 by 40 foot path, 3 inches deep

Length 10 feet, width 40 feet, depth 3 inches, waste 10 percent, density left blank. Exact volume 3.70 cubic yards. Volume to order 4.07 cubic yards. Weight 5.70 short tons at 1.4 short tons per cubic yard. No cost line, because the cost field was empty. The 0.37 cubic yard gap between the exact volume and the order is the 10 percent allowance. If the path is boxed in by timber and the ground is already flat, you might lower that to 5 percent and watch the tons drop before you call the yard.

The same kind of path in metres

Length 8 metres, width 1.2 metres, depth 50 millimetres, waste 10 percent, density blank. Exact volume 0.48 cubic metres. Volume to order 0.53 cubic metres. Weight 0.88 tonnes. The density line reads 1.66 tonnes per cubic metre and says it is the planning default. That 0.88 tonnes is the exact conversion of 1.4 short tons per cubic yard, not a second guess. Fifty millimetres is the loose depth. If you compact it, the finished surface will sit lower.

A price, not a quote

Length 12 feet, width 24 feet, depth 4 inches, waste 0, cost 45. The volume is 3.56 cubic yards either way, because waste is zero. The weight shows as 4.98 short tons. The material cost is 224.00. The unrounded weight times 45 is a round 224. Multiplying the displayed 4.98 by 45 gives 224.10, a dime higher, which is why the formula uses the full weight and the summary rounds the tons for reading. There is still no delivery in the 224.00. If the yard’s truck costs 150 to show up, the stone is not a 224 job.

Change the density to 1.5 on that same 12 by 24 by 4 inch area, still with no waste, and the weight becomes 5.33 short tons. The volume stays 3.56 cubic yards. Density never creates stone. It only changes how heavy the stone you already measured is.

Mistakes that throw the order off

Confusing yards and tons is the one that makes the truck too small or the invoice look wrong. A cubic yard is a volume. A ton is a weight. At the default density they are not equal: 3.56 cubic yards is 4.98 short tons, not 3.56 tons. Read the label on the result that matches how the yard sells.

Ordering the compacted depth as if it were loose depth leaves the finished surface low. This calculator places the depth you type. It does not shrink it for a roller. If a supplier tells you their base settles by a certain amount, add that in the waste field or increase the depth, and write down which one you did.

Using topsoil density, or a bagged-pea-gravel density, for a quarry base will move the tons even when the hole is right. The default is a crushed-stone planning figure. Bagged gravel sold by the cubic foot is often a different product with a different weight, and it may be easier to count bags from the volume than to force it through a per-ton price.

Forgetting the fabric and the edging does not change the tons, and it does change the project. Geotextile is sold by the roll. Edging is sold by the length. Neither is in the weight. Budget them beside the stone instead of burying them in the waste percentage, or you will not know which number to argue about later.

Measuring a flared driveway as one fat rectangle double-counts the narrow part or misses the flare. If the drive is 10 feet wide for most of its length and 18 feet wide at the street, those are two rectangles. Run them separately and add the tons. One average width is fine only when you actually averaged it, not when you typed the widest point for the whole length.

A circle entered as diameter by diameter is the square around the circle, which is too much stone. Use the coverage table or an equivalent rectangle based on the real area.

Ordering it without a surprise

The weight is also a hauling limit. At 1.4 short tons per cubic yard the stone is 2,800 pounds per yard. Compare that with the payload on the truck before you offer to pick it up. A short path can be a legal load. A 5.70 short ton path is not a single trip in a light pickup, whatever the volume looks like on paper.

Ask the yard two questions the calculator cannot answer: what density they use for the product you named, and what the delivery minimum is. Then put their density in the field and compare their minimum with the weight to order. If your order is under the minimum, the invoice will not match this page, and that is the yard’s rule rather than a math error.

If this stone is the base under a slab, keep the two orders apart. The concrete thickness does not include the stone, and the stone depth does not include the concrete. The concrete slab calculator takes the slab. This page takes the base. Using one depth for both is how people buy twice as much of one and none of the other.

Replace the default density as soon as you have a better number. 1.4 short tons per cubic yard, which is 2,800 pounds, is a figure aggregate yards publish for clean crushed stone. South Dakota Rock Supply’s stone calculator uses it for grades such as #57 and lists crusher run higher, about 1.5. It is not a laboratory constant for the pile on your ticket. The result says “planning default” when it is using 1.4. When those words disappear, the density is yours.

Common questions

How many tons are in a cubic yard of gravel?

It depends on the stone. At the default density of 1.4 short tons per cubic yard, one cubic yard weighs 1.4 short tons, which is 2,800 pounds. A lighter pea gravel and a dense graded base will not match that. If the quarry sells a different figure, type it into the density field. The volume does not change when you do. The weight does.

Is crushed stone the same as gravel here?

The formula is the same. Both are a volume times a density. The material is not the same in a truck. Pea gravel, crushed limestone, recycled concrete, and a road base can all sit near 1.4 short tons per cubic yard or well away from it. The name on the order should be the product the yard quoted, and the density should be theirs if they published one.

What if the yard only sells by the ton, or only by the yard?

If they sell by the cubic yard, the volume to order is the number to read and the weight is only a check. If they sell by the ton, you need a density to turn your depth into weight. Leaving the density blank uses 1.4 short tons per cubic yard. That is a planning default for crushed stone, not a promise about the pile you are looking at.

Does the cost include delivery?

No. The cost line is the weight multiplied by the rate you type, in your own currency. A per-ton price of 45 on the 12 by 24 foot example comes out to 224.00 for the stone. A delivery fee, a fuel surcharge, tax, and the fabric under the stone are extra. Ask for those as their own numbers.

Why is the metric density 1.66 and not 1.4?

Those are the same density in different units. 1.4 short tons per cubic yard converts to about 1.66 tonnes per cubic metre. The calculator uses the exact conversion when the field is blank, and it shows 1.66 in the metric result. If you type 1.66 yourself, that is your number, and it is a hair off the exact conversion. For a planning order the difference is small. For a large yardage, paste the quarry's figure instead of either default.

Is the 10 percent waste a compaction factor?

No. Compaction depends on the product, the moisture, and how hard you roll it. The 10 percent already in the field is an allowance for uneven ground, a bit of scatter, and the fact that the hole you dug is not a perfect box. If you need 4 inches after compaction, the loose depth has to be deeper than 4 inches, and this page will not invent that extra depth for you. Measure the loose depth you intend to place, or raise the waste until the order matches what your supplier recommends for that product.

Can I enter a circular driveway or a curved path?

Not as a circle. The volume is length times width times depth. For a curve, break it into a few rectangles that follow the path, run each one, and add the volumes. A circle's area is pi times radius squared. You can turn that area into an equivalent rectangle, for example a 10 foot by 10 foot square for about 100 square feet, and enter that. Do not enter the diameter as both length and width unless the circle really is that large.

Should I haul a cubic yard in a pickup?

Check the payload sticker before you do. At the default density, one cubic yard is 1.4 short tons, or 2,800 pounds. Many half-ton pickups are not rated to carry that once you include people and tools. The calculator gives you the weight. The door jamb of the truck tells you whether the truck can take it. A yard that delivers may have a minimum load that is larger than your order. Ask them. There is no universal minimum in this result.

  • Concrete slab

    Rectangular slab or patio from length, width, and thickness, then bags at the yield you pick.

  • Mulch and topsoil

    Cubic yards or cubic metres, bag count, and presets for common depths.

Updated 29 November 2026. Written by August H. The byline is not a claim of a license or a trade.